Transport Secretary Attacks Striking Rail Unions As He Announces £1Bn In Digital Spending

Transport Secretary Attacks Striking Rail Unions As He Announces £1Bn In Digital Spending

By Tony O’Reilly-

Transport Secretary Grant Shapps  has attacked  striking rail unions as he announced a £1 billion investment in digital signalling.

Shapps said that giving the go-ahead for the replacement of Victorian signalling infrastructure on the East Coast Main Line (ECML) proves the Government is modernising the railways “despite the best efforts of unions”.

The technology, which will be rolled out across the entire southern section of the line – from London’s King’s Cross to Stoke Tunnels, just south of Grantham – will mean faster, safer and more regular trains for millions of people.

The funding will remove outdated lineside signalling and replace it with the European train control system (ETCS), which brings signalling into train drivers’ cabs and provides them with real-time, continuous information throughout their journey.

The new in-cab technology will create a more responsive, more resilient railway and, crucially for passengers, one that can recover quicker when journeys don’t go to plan. Most importantly, as the system will constantly monitor the train’s speed, it will also create a safer railway.

Toufic Machnouk, Director, Industry Partnership for Digital Railway, Network Rail, said:

‘We are delighted to have been given the go ahead for this ground-breaking programme that will transform the capability and resilience of the East Coast Main Line and be a key enabler for the wider network.

The East Coast Digital Programme (ECDP) is uniquely bringing together all elements of track and train through a pioneering industry partnership that is working beyond boundaries in a deep collaboration.

We will upskill our people and use new technology to improve the way we work for the benefit of passengers and freight customers.

As well as the many passenger benefits, the ECDP will deliver a much-needed financial boost to the industry and, over its lifetime, is 42% cheaper than the current system.

It will also help the government towards its net zero goal by decreasing carbon emissions by 55,000 tonnes – the equivalent of more than 65,000 one-way flights from London to New York.

David Horne, Managing Director at London North Eastern Railway (LNER), said:

Digital signalling will allow the full potential of our Azuma fleet technology to be realised and means our customers will benefit from even more reliable and sustainable journeys in the future.

Tom Moran, Thameslink and Great Northern Managing Director, said:

”We’re delighted with this announcement, which will mean better services in the future for our passengers on the East Coast Mainline.

This massive investment builds on our work to implement digital signalling on the Northern City Line into Moorgate in the City of London and it means we can continue to roll out the technology on some of our key routes.

The ECDP follows more than £350 million of prior investment to fit other services on the route with the new technology, with over 80% of passenger rolling stock on the East Coast Mainline South already using the ETCS.

Network Rail will prioritise the request for a further investment of £427 million as part of the next control period settlement, bringing the overall investment to just under £2 billion.

Maggie Simpson OBE, Director General, Rail Freight Group, said:

”Freight customers throughout supply chains are dependent on reliable rail services to deliver goods to people.

We welcome this investment in digital signalling that will provide a more flexible and resilient railway, unlocking future growth potential in rail freight traffic supporting both decarbonisation and economic growth.

The government wants to bring the industry into the 21st century.

The Transport Salaried Staffs Association (TSSA) insisted it was a “non-announcement”, as much of the existing system needs replacing anyway.

Mr Shapps is embroiled in a bitter row with the Rail, Maritime and Transport (RMT) union.

An estimated 40,000 RMT members at Network Rail and 13 train operators went on strike last week in a dispute over jobs, pay and conditions.

Only a fifth of passenger trains were able to operate on the three strike days, with services also heavily reduced on the days after the walkouts.

Members of drivers’ union Aslef at Greater Anglia and the Croydon Tramlink walked out in separate pay rows in recent days.

The TSSA served notice to ballot its members at Greater Anglia last week for strike action and action short of strike over pay, conditions and job security.

Mr Shapps told the PA news agency that new signalling will cut delays and lead to more frequent trains on the ECML, but “we just need to make sure the work practices follow from the steam age into the digital age”.

Rail staff are “happy to work with us” and have shown they are “prepared to adopt modernisation”, he claimed.
“Their union bosses are the ones who are stopping very obvious modernisations taking place.”

Mr Shapps cited the example of maintenance crews based at London Euston not being permitted to work at London King’s Cross – less than half a mile away – because the stations are classed as being in different regions of the rail network.

“To the general public that will seem entirely bizarre,” he said.

“We’re building a railway fit for the 21st century.

“We’ve got to get out of these 20th century work practices in order that the whole thing works together and provides a much better service for the public.”

Mr Shapps went on: “While union bosses waste time touring television studios and standing on picket lines, I am busy getting on with the job at hand and modernising our railway.

“The world is changing and, despite the best efforts of unions, I am determined to help our railway change with it.”

TSSA general secretary Manuel Cortes said the Secretary of State will “fool precisely no-one” by promising “jam tomorrow while implementing cuts today”.

Medical emergency on West Midlands Metro leads to tram being withdrawn from service
He added: “This non-announcement is part of the wider Tory strategy of deceit, lies and fabrications.”

One third of the UK’s population live within 20 minutes of a station on the EMCL, which runs from London King’s Cross to Edinburgh via locations such as Peterborough, Doncaster, York and Newcastle.

The £1 billion investment announced by Mr Shapps will complete the East Coast Digital Programme.

Outdated lineside infrastructure will be replaced with the European train control system (ETCS) on a 100-mile stretch of the line between London King’s Cross and Stoke Tunnel to the south of Grantham, Lincolnshire.

Grant Shapps is creating a straw man to knock down by falsely drawing equivalence between our strike action and this latest introduction of digital signalling

ETCS technology reduces journey times and boosts safety for passenger and freight services by bringing signalling into train drivers’ cabs, providing them with real-time, continuous information.

It allows trains to run closer together than conventional signalling.

Toufic Machnouk, director of industry partnership for digital railway at Network Rail, said ETCS will “transform the capability and resilience of the East Coast Main Line”.

David Horne, managing director at London North Eastern Railway, which operates long-distance trains on the line, said digital signalling will “allow the full potential of our Azuma fleet technology to be realised”.

Previous Government funding of £350 million ensured trains using the ECML have been made compatible with digital signalling.

Infrastructure is being installed on the Northern City Line – a branch of the ECML running between London’s Moorgate and Finsbury Park – to test the system.

Mick Lynch, general secretary of the Rail, Maritime and Transport union, said: “Grant Shapps is creating a straw man to knock down by falsely drawing equivalence between our strike action and this latest introduction of digital signalling.

“RMT is fully committed to the development of a digital railway and genuine modernisation, as long as our members have a guarantee of no compulsory redundancies, something Network Rail has offered us for over a decade.

“The digital railway is a 15-year project undertaken by Network Rail that RMT is negotiating on how to best implement so it is bizarre of the Transport Secretary to attempt to weaponize it to score cheap political points.

“What holds back the development of the railway is private companies and contractors making a mint from the taxpayer and charging exorbitant fares to customers while overseeing a decaying Victorian railway line.”

He added: “It is outrageous that the Transport Secretary is taking credit for a modernisation programme on digital signalling that RMT helped develop and is now implementing alongside the rail industry.”

Aslef general secretary Mick Whelan said: “Grant Shapps is, I’m afraid, badly mistaken. He either doesn’t know he is wrong, in which he case he is inept, or, at least, exceptionally badly briefed, or, if he does know that what he is saying is simply not true, then he is a liar.

“This trade union has been fully engaged in the projects he is talking about. If he would like that to change, fine; if not, then he should do the right thing and publicly apologise.

Spread the news